ABOUT
Kiryat-Sefer parking lot was one of the last remaining open spaces in the densely populated center of Tel-Aviv. In the mid-1990s, initiatives for the construction of a high-rise residential complex in its place sparked a 15 year long community campaign, which led the municipality in 2010, to build a public park instead.
The main theme of the park, an “Ecological and Democratic park”, conveys a longing to belong to both community and nature.
INFO.
Status: Completed
Years: 2010-2013
Size: 12,000 Sqm
REED Lead Arch: Ram Eisenberg
Client: Tel Aviv Municipality
Project Manager: Ami Yaffe
Participatory process facilitator: Amitay Harlev, Modus
Construction: Jacob Livni
Water systems: Yael Ben Zvi
"Hidden Treasure" artist: Yoav Weiss
Planning Process:

POSTS AND PUBLICATIONS
ENG
2013
Kiryat Sefer Park (Erik Schofield)
Rediscovering nature (Itay Palti)
2011
Putting the Public in Public Park
(Noam Dvir)
HEB
2013
משהו חסר בפארקים חדשים המרהיבים
של ת"א (אסתר זנדברג)
גן קרית ספר – ככה עושים את זה נכון
(עמית נויפלד)
ניצחון ירוק: הפארק החדש בלב תל אביב
(אביב לביא)
הוסרו הגדרות סביב פארק קרית ספר
(קשת רוזנבלום)
גינת קרית ספר: הניצחון המתוק והירוק של התושבים על המגדלים (נעמה ריבה)
2012
ניצחון לתושבי קריית ספר בת"א: החלה בניית פארק במתחם המריבה (שירלי ששון-עזר)
2010